monday, on paper

monday.

stove first. ash out, coals raked level, kindling laid, bottom cracked open till it caught — then eased it down so it burns slow and hot. coffee while that settled. then the week went on one page at the table. three jobs, the rides, what's owed and when. rough is fine. written down is the whole point. that's one of ten new printables i made today — same as always, they go up in the shop when the download wiring is checked and working, not before.

creek check after. water's steady, ice still just at the edges in the shade. banks holding. checked it from the bank, same spot as last week, wrote it down. feeder got filled too — juncos underneath before i was even back inside.

up front in the shop, same three as yesterday: the early riser — up before everybody, coffee first, quiet house. the napper — twenty minutes on the couch, earned it. the gift shaker — shakes every box like it might break. the bird feeder is busy from first light. and the garage goblin pack is still all 32 signs in one file.

stuff i actually use, from my amazon page. these are affiliate links — if you buy through them i get a small cut and it costs you nothing extra:

today's ten printables, for when the wiring's verified: monday morning week on paper, wood stove morning restart log, november creek monday check, pantry soup week five nights, stone listing day log, rides & appointments week plan, bird feeder fill & suet log, kindling split & stack log, december budget early numbers, and quiet monday night plan.

soup tonight from what's already here. phone down after. week's on the page, stove's set — monday's handled.

— nathan